Sn. | Project | Location | Client | Consultant | Main Contractor | Status |
|
1 | Guggenheim Museum | Abu Dhabi –Culture district | TDC | WSP | JV -Trojan -Besix | In progress |
|
Description | 4 x 2500 KVA by Kohler RTS Scope: Exhaust Piping insulation and cladding Daily Fuel tanks UL Listed + 75000 L Underground tank UL + Submersible fuel transfer pumps & PLC control panel + Double wall Fuel Piping HDPE double wall underground piping Fuel filtration system | ||||||
2 | Sheikh TAHNON AL-NAHYAAN Palace | Abu Dhabi | Trojan Holding | M/S APG Consultant | Trojan General Contracting LLC | Done |
Description | RTS Scope: Fuel system & HVAC Chillers Installation 2 x 20,000 L double wall underground tanks + 4500 L double wall above ground tanks & Fuel transfer pump set with control panel Double wall piping between the tanks Fuel system accessories Chillers Offloading installation & Ducts installations | |||||
3 | Latifa Hospital NEW DUBAI GYNECOLOGY AND FERTILITY CLINICS | Jadaf Dubai | DUBAI HEALTH AUTHORITY | NATIONAL ENGINEERING BUREAU (NEB) | UNIVERSAL VOLTAS LLC. | Done |
Description | 1 x 1000 KVA by JCB RTS Scope: Shifting and positioning FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets) Exhaust Piping & Sound attenuators for air intake and air discharge | |||||
4 | The Palace | Dubai Creek Harbor | Emaar | IAN Banham & Associates (IBA) | Al Shafar | Done |
Description | 1 x 2200 KVA by Sterling RTS Scope: Shifting and positioning FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets) Exhaust Piping & Sound attenuators for air intake and air discharge | |||||
5 | Opera District – Plot A2 A3 | Dubai | Opera District – Plot A2 A3 | Dubai | Opera District – Plot A2 A3 | Dubai |
Description | 2 X 2250 KVA, Cummins Gensets (Fuel tank + fuel piping Exhaust Muffler + SS Piping installation, insulation and cladding | |||||
Sn. | Project | Location | Client | Consultant | Main Contractor | Status | ||||||||||
6 | Nakheel Mall | Dubai | Nakheel | M/S WME ENGINEERING CONSULTANT | UNEC & ACTCO Joint Venture | Completed | ||||||||||
Description | 1 X 1800 + 4 x 1500 + 1 x 1250KVA By FG WIllson RTS Scope: Offloading And Positioning Exhaust Piping insulation and cladding Sound attenuation for air inlet and air outlet to achieve 85dB(A) @ 1 mtr Motorized Louvers for air outlet and inlet openings Fuel system | |||||||||||||||
|
|
|
|
|
|
| ||||||||||
7 | Metropolitan Hotel | Dubai | AL HANI GULF CONT. | KHATIB & ALAMI | SUN CONT. | Completed | ||||||||||
Description | HVAC System installation Chilled water Piping of different sizes from 1” to 16” with insulation Chilled water pumps , FCU unit, Ducts, | |||||||||||||||
|
|
|
|
|
|
| ||||||||||
8 | (RAECO) Rural Areas Electricity Company | Oman | MDS -OMAN | Completed | ||||||||||||
Description | 5 X 1500 KVA, 11 KV Engine MTU by SDMO – Containerized & mobile units RTS scope of work was: Containers design and arrangement of the control panels and Power and control cables connection of all Auxiliaries supply from Transformer 11KV/400V And commissioning, testing and start up of all 5 units | |||||||||||||||
|
|
|
|
|
|
| ||||||||||
9 | Al Kalouti Gold Refinery Factory | Dubai | Casablanca | Ian Banham | Al Andalus TRDG. & ELEC Contracting | Completed | ||||||||||
Description | 1 x 1000 KVA Perkins by Casablanca RTS scope: Offloading & positioning of genset, Exhaust muffler installation, insulation & cladding – Sound attenuators for air inlet and air outlet
| |||||||||||||||
|
|
|
|
|
|
| ||||||||||
10 | Vida hotel and residence Phase 2,3,4 | Dubai Creek Harbor | Emaar | United Masters | Completed | |||||||||||
Description | 6 x 1500 KVA Sterling (offloading and positioning – Exhaust piping – Sound Attenuators and fuel system
| |||||||||||||||
Sn. | Project | Location | Client | Consultant | Main Contractor | Status | ||||||||||
11 | Dragon Theatre – Al Habtoor City | Dubai | Commodore MEP | Khatib & Alami | Al Habtoor Leighton HLG | Completed | ||||||||||
Description | 1 x 1850 KVA by CATERPILLAR RTS Scope: Offloading & positioning Exhaust Piping insulation and cladding Fuel Piping & cable tray pulling and termination | |||||||||||||||
|
|
|
|
|
|
| ||||||||||
12 | MAZAYA | Dubai | AL ANDALUS CONT. | BELYOHA | AL SAHEL CONT. | Completed | ||||||||||
Description | 2x 100 KVA SDMO GENSETS Exhaust Piping insulation and cladding Air outlet duct | |||||||||||||||
|
|
|
| |||||||||||||
13 | Butterfly Tower | Dubai | Al Andalus TRDG. & ELEC Contracting | Arif & Bintoak | AL Sahel Contracting | Completed | ||||||||||
Description | 1×1000 KVA Mitsubishi by Consukorra RTS scope: Exhaust Piping insulation & cladding Diesel tank supply and installation Fuel Piping with filling cabinet and monitoring system | |||||||||||||||
|
|
|
|
|
|
| ||||||||||
14 | Al ShafarTower | Dubai | Al Shafar United | Arenco | ASGC | Completed | ||||||||||
Description | 1x 650 KVA Perkins by Gengan RTS scope: Exhaust Piping for 30 mtrs with back pressure calculation, insulation and cladding Sound attenuators for air inlet and outlet Fuel piping with fuel filling cabinet and monitoring system | |||||||||||||||
|
|
|
|
|
|
| ||||||||||
15 | New York University | Abu Dhabi | MDS – Dubai | WSP | BK Gulf | Completed | ||||||||||
Description | 4 X 2500 KVA, 11 KV Perkins by SDMO, Gensets Synchronized Together with SDMO Controller Kerys – Fuel Tank Supply System, the Radiator Piping, Exhaust Muffler & piping insulation and cladding and Sound attenuation of the Power house with the air inlet and outlet Louvers | |||||||||||||||
16 | RTA ENTERPRISE COMMAND & CONTROL CENTER BUILDING | Dubai | RTA | M/S ADNAN SAFFARINI | AL SHAFAR GENERAL CONTRACTING | Completed | ||||||
Description | 3X 1700 By CAT RTS Scope: Offloading And Positioning Exhaust Piping insulation and cladding Sound attenuation for air inlet and air outlet to achieve 85dB(A) @ 1 mtr | |||||||||||
Sn. | Project | Location | Client | Consultant | Main Contractor | Status | ||||||
17 | AL Fujairah Hotel | Fujairah | Al Andalus TRDG. & ELEC Contracting | NEB (National Engineering Bureau) | Ghantoot Group | Completed | ||||||
Description | 1 x 1250 KVA by Mitsubishi Exhaust Piping insulation and cladding Fuel Piping & Ducting and sound insulation Chilled water Piping – HVAC Ducting | |||||||||||
18 | Medclinic city Hospital | Healthcare City Dubai | Al Sabbah Electrical, Mechanical & Sanitary, Contracting Est (SEMCO) | Hyder | Kele Contracting | Completed |
Description | 2 x 1500 KVA by Mitsubishi RTS Scope: Shifting and positioning in 6th floor for 2 x 12 ton genset + 15 ton tank Exhaust Piping insulation and cladding Fuel Piping & Ducting and sound insulation | |||||
19 | Offices Development at Mirdif
| Dubai | Khansaheb Building Service Division (KBSD) | Proleed
| Khansaheb Civil Engineering | Completed |
Description | 1 x 700 KVA by SDMO RTS Scope: Exhaust Piping insulation and cladding for 50 Mtrs with back pressure calculation Fuel Tank & Piping Ducting and Sound insulation up to 60 dB(A) @ 3 Mtr | |||||
20 | Bin Shafar Buliding at AL Barsha
| Dubai | BSC Electro-Mechanical LLC | AbdelRahiem Consulting | Bin Shafar Contracting | Completed |
Description | 1 x 100 KVA by RTS RTS Scope: Supply testing and commissioning of 100 KVA Perkins Powered Genset Exhaust Piping insulation and cladding Ducting and Sound insulation | |||||
21 | First Avenue Mall & HOTEL | Motor City Dubai | PIVOT Contracting | DEWAN Consultant | Pivot Contracting | Completed | ||||||
Description | 2 x 500 + 1 x 200 KVA by SDMO RTS Scope: Shifting and positioning Exhaust Piping insulation and cladding Supply and installation of Diesel Tanks 6000 L + Fuel Piping Ducting and sound insulation of the room Walls and air intake and air discharge | |||||||||||
Sn. | Project | Location | Client | Consultant | Main Contractor | Status | ||||||
22 | Blue Water Residential | Dubai | MERAAS | CKR | Al Shafar General Contracting | Completed | ||||||
Description | 4 x 1250 KVA + 1 x 1750 KVA by CAT RTS Scope: Exhaust Piping insulation and cladding Fuel Piping Sound attenuation for air inlet and air outlet to achieve 75dB(A) @ 1 mtr | |||||||||||
23 | BAHWAN TOWER | Down Town Dubai | BAHWAN REAL ESTATE | Arif & Bintoak | AL Qandeel | Completed |
Description | 1 x 250 KVA by SDMO RTS Scope: Shifting and positioning Exhaust Piping insulation and cladding Ducting and sound insulation of the room Walls and air intake and air discharge | |||||
24 | Dubai ARENA | City Walk | MERAAS | dar | ASGC | Completed |
Description | 3 x 1500 KVA by Cummins RTS Scope: Shifting and positioning Exhaust Piping insulation and cladding Fuel Piping Sound attenuation for air inlet and air outlet to achieve 75dB(A) @ 1 mtr | |||||
25 | SIGNATURE TOWER | JLT Dubai | ASGC | ARCHGROUP | ASU | Completed |
Description | 1 x 1500 KVA by SAKR RTS Scope: Shifting and positioning Exhaust Piping insulation and cladding Ducting and Fuel piping | |||||
26 | DYAAR HOTEL | AL BARSHA Dubai | SUN | ARCHGROUP | AL HANI GULF | Completed |
Description | 1 x 1500 KVA by FG WILSON RTS Scope: Shifting and positioning Exhaust Piping insulation and cladding Ducting and Fuel piping | |||||
27 | The ONE – THE PALM | PALM JUMEIRAH | OMNYIAT | CLARKE SAMHDIN | MULTIPLEX | Completed | |||||||
Description | 1 x 1500 KVA by Cummins for Plafond as MEP CONt. RTS Scope: Exhaust Piping insulation and cladding Ducting and Fuel piping | ||||||||||||
Sn. | Project | Location | Client | Consultant | Main Contractor | Status |
| ||||||
28 | ETISALAT BUR DUBAI –DATA CENTER | Dubai | ETISALAT |
| BIN FIRDAN | Completed |
| ||||||
Description | 1 x 1500 KVA by Cummins RTS Scope: Exhaust Piping insulation and cladding Fuel tanks + fuel transfer pump set & control panel + Fuel Piping Remote radiator + heat exchanger and radiator piping till the roof |
| |||||||||||
29 | Hilton & JW MARRIOT | PALM JUMEIRAH | ARENCO | ARENCO | CHINASTATE Construction Engineering Corp | In Progress |
Description | 2 x 1500 + 2 x 500 + 2 x 350 KVA by SDMO RTS Scope: Shifting and positioning FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets, Pump systems, Monitoring System | |||||
30 | Crescent Resort & Hotel | PALM JUMEIRAH | ARENCO | ARENCO | CHINASTATE Construction Engineering Corp | In Progress |
Description | 1 x 1400 + 1 x 900 KVA by SDMO RTS Scope: Shifting and positioning FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets, Pump systems, Monitoring System | |||||
31 | Boulevard Residential Tower | Down town Boulevard | EMAAR | DEWAN | ACC | Completed |
Description | RTS Scope: HVAC 1 x 2500 KVA by FG Wilson FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets) Exhaust Piping for 140 Mtrs of 30” pipe Sound attenuators for intake and air discharge with fans | |||||
32 | UNION CO-OP | AL TAY Dubai | UNION COOP | Omar Bin Eid Architects | AMANA | Completed |
Description | 1 X 1500 KVA, Perkins Genset by JENGAN Exhaust Muffler + Piping installation, insulation and cladding Fuel tank + fuel piping Air Intake and discharge sound attenuator and ducting | |||||
33 | Downtown View II | PALM JUMEIRAH | EMAAR | ARENCO | CHINASTATE Construction Engineering Corp | Done |
Description | 2 x 1500 + 2 x 500 + 2 x 350 KVA by SDMO RTS Scope: Shifting and positioning FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets, Pump systems, Monitoring System | |||||
34 | B4 | PALM JUMEIRAH | ARENCO | ARENCO | CHINASTATE Construction Engineering Corp | Done |
Description | 1 x 1400 + 1 x 900 KVA by SDMO RTS Scope: Shifting and positioning FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets, Pump systems, Monitoring System | |||||
35 | Opera District – Plot B1 B2 | Dubai | EMAAR | KEO Consultant | Reliance Contracting Co. (RCC) | Done |
Description | 1 X 2250 KVA, Cummins Gensets Fuel system Fuel tank 11000 L + 2500 L Fuel pump set + automatic Control Panel Double wall piping between tanks Fuel system accessories | |||||
36 | Deira Water Front Development Plot 9,10 | Dubai | Deira Water Front Development LLC | IAN Banham & Associates (IBA) | China State Construction & Engineering Corp. | Done |
Description | 1 x 1000 KVA by JCB RTS Scope: Shifting and positioning FUEL SYSTEM ( storage tanks, Fuel Piping, Filling cabinets) Exhaust Piping & Sound attenuators for air intake and air discharge | |||||